Hindustan Steelworks Construction Limited (HSCL)
Location
Kudatini, Ballari, Karnataka
Duration
2014–2017

Construction of Ash Pond Stage-II and associated infrastructure for the 1 × 700 MW Unit-III expansion at Bellary Thermal Power Station including large-scale earthworks, ash disposal infrastructure, stilling ponds, and development of a peripheral road network.