Manyatha Tech Park Flyover

Signal-free connectivity for 100,000+ employees

121
Acres in Tech Park
100,000+
Direct Beneficiaries
2018-2022
Project Duration
Signal-Free
Grade-Separated Design

Project Overview

The Manyatha Tech Park Flyover represents a transformational infrastructure project that connected Embassy Group’s sprawling 121-acre tech park to Bengaluru’s Outer Ring Road network through a dedicated flyover. This project directly benefited nearly 100,000 employees working within the park.

The Challenge

Problem: Manyatha Tech Park, home to 100+ multinational and Indian IT companies, faced severe traffic congestion on the Outer Ring Road. Peak-hour traffic jams caused 30-45 minute commute delays, impacting employee productivity and the park’s business competitiveness.

Complexity: The project required creating seamless connectivity between ORR and the tech park while maintaining traffic flow on a heavily-used corridor, all while the park continued full operations.

Scope of Work

Dedicated Flyover Connection

Grade-separated flyover linking Nagawara-Veerannapalya corridor to tech park

Dedicated Entry & Exit Ramps

Separate entry and exit ramps eliminating merging conflicts

Road Infrastructure

4-lane flyover with modern pavement and drainage systems

Utility Corridors

Dedicated spaces for power, water, and telecommunications

Modern Lighting

Energy-efficient LED illumination for safety

Traffic Management

Advanced signage and traffic control systems

Solution & Execution

Approach: PJB Engineers employed a phased construction strategy that maintained continuous traffic flow on ORR while constructing the flyover. The team:

  • Developed independent sub-sections to enable parallel construction
  • Coordinated with BBMP and traffic police for minimal disruption
  • Implemented night-time construction schedules for peak-hour protection
  • Created temporary traffic diversions that minimized commute time impact
  • Maintained open communication with 100+ IT companies in the park

Project Outcomes & Impact

Measurable Improvements

The flyover reduced peak-hour commute times by 40-50%, transforming employee experience and the tech park’s competitiveness. The dedicated entry/exit ramps eliminated merge conflicts, resulting in smoother traffic flow across the Nagawara-Thanisandra-Veerannapalya corridor.

Key Benefits Delivered

Travel Time Reduction

40-50% reduction in peak-hour commute times for 100,000+ employees

Business Competitiveness

Improved employee satisfaction and talent retention

Environmental Impact

Reduced vehicle emissions through improved traffic flow

Traffic Efficiency

Signal-free corridor eliminates bottlenecks and waiting times

Safety Improvement

Grade-separated design reduces conflict points

Economic Impact

Increased property values and business growth in the region